Week 6: Release and wrap up

Week 6: Release and wrap up

The last week makes releasing routine. The pipeline deploys to the cluster, a release replaces pods one at a time so visitors do not notice, and a bad release can be taken back. HTTPS on the cluster is optional. You finish by looking critically at your setup, completing your reports and destroying the cluster.

Destroying the cluster cannot be undone. Do it only when everything is pushed and the reports are written.

Issues

Work through the issues in order, in your own repository. Each one builds on the one before.

IssueWhat you do
deploy-from-ciThe pipeline applies your manifests to the cluster when you push a tag.
rolling-updatesA release without downtime, and two ways to take a bad one back.
https-traefikOptional: HTTPS from the cluster with a Campus CA certificate.
wrap-upA last look at the cluster, the six weekly reports (with a reflection on the shortcuts in your setup), and terraform destroy.

Write the week report in report/week-6.md after the last issue.

When everything is done, hand in with a merge request, see Assignment 2.

Slide decks

Each deck is a self-study lecture of about 15–20 minutes, except the intro, which takes about five.

Reading material